Scope before price
ForgeSpan Sourcing quote comparison and document review
ForgeSpan Sourcing lines up alternative quotations. The work is to make each factory answer the same brief. We do not stamp drawings, pull permits or decide which code edition applies. That judgment stays with the buyer and the licensed professionals on the project.
Send Project RequirementsWhat each quote should echo
- Use and occupancy
- Module dimensions
- Design loads, if known
- Code jurisdiction
- Quantity
- Destination and scope boundary
Same question, two scope columns
Read across the row. If one column is blank, the quotes are not ready to compare. This table is a buyer worksheet, not a record of prices we have already received.
| Question | Shell or kit | Installed or turnkey |
|---|---|---|
| Primary frame and floor | Confirm whether the frame is included or buyer-supplied. | Confirm whether setting and leveling are included. |
| Secondary framing | Ask if purlin and girt members are in the package. | Ask who installs the secondary framing and roof. |
| Enclosure | Note wall and roof panels as included, excluded or optional. | Note openings, trim and sealant responsibility. |
| Foundation interface | Usually excluded from a shell number. | Still confirm anchor design and who pours the foundation. |
| Utilities | Often stopped at rough-in or left out entirely. | List electrical, plumbing and HVAC as separate lines. |
| Freight and tax | Ask for a delivered price to the named destination. | Do not fold freight into a bare module rate. |
Questions buyers ask before the first call
Can you obtain the original brand?
No. The service compares alternative products. A brand name in the search is context for the requirement, not an order for that brand.
Do you already know the price?
No published rate on this site is a factory quote. Numbers appear only after a supplier prices the same specification, quantity, destination and scope.
Which code will you pre-approve?
None. IBC, IRC, HUD Code, ASCE 7, AISC 360 and AWS D1.1 are references a project may need to check. Compliance depends on location, loads and the documents supplied with the quote.
What if two quotes use different steel?
Record hot-rolled steel or cold-formed steel as a deviation. Do not average the prices until the buyer accepts the substitution.
Put the exclusions in the same note as the wish list
A complete note is more useful than a low headline number. Include destination, requested delivery timing and the scope you want priced.